• About OPRD
  • Projects
    • IPA I – Operational Programme for Regional Development 2007-2013
      • Corridor X Motorway Completion
        • Upgrading remaining link along the Corridor X to the level of motorway
      • Upgrading and Modernization of the Transport Infrastructure
        • Improving the Rail Infrastructure along the South East Europe Core Regional Network
        • Improving the Road Infrastructure along the South East Europe Core Regional Network
      • Improvement of Environmental Infrastructure
        • Establishing Wastewater Collection and Treatment Infrastructure Meeting the EC Requirements
        • Establishing of an Integrated and Financially Self-sustainable Waste Management System
      • Technical Assistance
        • Administration of the operational programme implementation
        • Preparation of investment projects and programmes
    • IPA II – Transport 2014 – 2020
      • Priority Action 1 RAIL Transport infrastucture
      • Priority Action 2 Road Transport Infrastucure
      • Priority Action 3
    • IPA II – Environment and Climate Changes
      • Approximation of environmental and climate action legislation in priority areas and gradual move to sector based approach
      • Investment in water and waste management
      • Support to Sustainable Development
  • News
  • Documents
  • Vacancies
  • Contact
  • Tenders

Improving the Road Infrastructure along the South East Europe Core Regional Network

Project Title Rehabilitation of motorway section Veles – Katlanovo, as part of the Corridor X
Main Objectives of the Project The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Rehabilitation of 24 km of the road sections from Veles to Katlanovo
Start Date  28th July 2014
End Date  15th  December 2015
Project type EuropeAid133196/D/WKS/MK

Works contract number 11-21607/1

Project Budget  6.648,254.27 €
Contractor’s name  STRABAG AG
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Reconstruction and upgrading of the motorway section Smokvica –Gevgelija, as part of the Corridor X
Main Objectives of the Project The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities Reconstruction and upgrading of the road sections from Smokvica to Gevgelija
Start Date 06th August 2015
End Date 01th  August 2017
Project type EuropeAid135699/IH/WKS/MK

Works contract number 12-5732/1

Project Budget 4.153,900.58 €
Contractor’s name GRANIT AD Skopje
Beneficiary Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC) PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Supervision of reconstruction and upgrading of the motorway section Smokvica –Gevgelija, as part of the Corridor X
Main Objectives of the Project The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Supervision of the works contract for reconstruction and upgrading of the road sections from Smokvica to Gevgelija
Start Date  07th August 2015
End Date  01th  October 2017
Project type EuropeAid135452/IH/SER/MK

Service contract number 12-5446/1

Project Budget  518,575.00 €
Contractor’s name  Egis International and its consortium partners
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Construction of new motorway section Demir Кapija-Smokvica  as a part of Pan-European Corridor X
Main Objectives of the Project The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Construction of a new motorway section from Demir Кapija to Smokvica
Start Date  01th August 2012
End Date  31th  December 2017
Project type EuropeAid131015/D/WKS/MK

Works contract number 09-25365/1

Project Budget  217.000.000.00 €
Contractor’s name  AKTOR Greece
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Supervision of the  Construction of new motorway section Demir Кapija-Smokvica as a part of Pan-European Corridor X
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Supervision of the works contract for construction of a new motorway section from Demir Кapija to Smokvica
Start Date  02th July 2012
End Date  30th  October 2017
Project type EuropeAid131014/D/SER/MK

Service  contract number 09-24859/1

Project Budget  8.900.000.00 €
Contractor’s name  EGIS International and its consortium partner
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Preparation of Study and Action plan for improvement of road safety along SEETO Comprehensive Network
Main Objectives of the Project  The overall objective of this project is promotion of safety and sustainability as a key objective in the planning and design of road traffic systems, in order to provide larger ratio between the invested resources and savings from reducing the number of accidents and their consequences,  that will be applicable in further phase of preparation of projects and tender documentation for the road infrastructure projects (taking into account the economic value of an accident is an important parameter in the economic evaluation of projects).
Project Outputs/Activities  Preparation of a study and Action plan for improvement of road safety along the Pan-European Corridors VIII and X including branch X d.
Start Date  01th October 2014
End Date  01th October 2015
Project type EuropeAid132633/C/SER/MK

Service  contract number 11-30508/1

Project Budget  145.271.00 €
Contractor’s name  SAFEGE
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Reconstruction and placement of traffic signs and road markings on certain interchanges along Corridor X and along the sections from Interchange Hipodrom – Interchange Miladinovci and from Interchange Hipodrom – Interchange Petrovec
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure and safety along the South East Europe core regional Network by supporting the development and modernisation of road infrastructure along Corridor X.
Project Outputs/Activities  Reconstruction and placement of traffic signs and road markings on certain interchanges along Corridor X (Interchanges: “Veles Jug (South)”, “Negotino”, “Demir Kapija” and “Gevgelija”) and along the sections from Interchange Hipodrom – Interchange Miladinovci and from Interchange Hipodrom – Interchange Petrovec.
Start Date  10th January 2016
End Date  25th April 2017
Project type EuropeAid136563/IH/WKS/MK

Works contract number 12-2452/1

Project Budget  1.258.00 €
Contractor’s name  GRANIT AD Skopje
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Rehabilitation of State Road А1, section Kumanovo–Miladinovci (right carriageway), as part of corridor X
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Rehabilitation of the State Road А1, from Kumanovo to Miladinovci (right carriageway), as part of corridor X
Start Date  15th February 2016
End Date  01th August 2017
Project type EuropeAid136425/IH/WKS/MK

Works contract number 12-9861/1

Project Budget  5.110.790 €
Contractor’s name  STRABAG AG
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Supervision of the rehabilitation of the State Road А1, section Kumanovo–Miladinovci (right carriageway), as part of corridor X
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Supervision of the works contract for rehabilitation of the State Road А1, section Kumanovo–Miladinovci (right carriageway), as part of corridor X
Start Date  26th February 2016
End Date  26th August 2017
Project type EuropeAid136424/IH/SER/MK

Service contract number 12-9974/1

Project Budget  604.725.00 €
Contractor’s name  IRD Engineering
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Rehabilitation of State Road А1, section Kumanovo–Miladinovci (left carriageway), as part of corridor X
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Rehabilitation of the State Road А1, from Kumanovo to Miladinovci (left carriageway), as part of corridor X
Start Date  28th April 2017
End Date  15th December 2017
Project type EuropeAid136422/IH/WKS/MK

Works contract number 12-1734/1

Project Budget  4.943.950,00 €
Contractor’s name  STRABAG AG
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk

 

Project Title Supervision of the rehabilitation of the State Road А1, section Kumanovo–Miladinovci (left carriageway), as part of corridor X
Main Objectives of the Project  The overall objective of this Operation is improving the road infrastructure along the South East Europe core regional Network by supporting the development of road infrastructure along Corridor X.
Project Outputs/Activities  Supervision of the works contract for rehabilitation of the State Road А1, section Kumanovo–Miladinovci (left carriageway), as part of corridor X
Start Date  11th April 2017
End Date  15th December 2017
Project type EuropeAid136421/IH/SER/MK

Service contract number 12-1335/1

Project Budget  630.500.00 €
Contractor’s name  IRD Engineering
Beneficiary  Ministry of transport and communications
Responsible Implementing Department within MoEPP as end beneficiary  Department for European Union – IPA Monitoring Unit
End Beneficiary (other than MoEPP such as municipality and PUC)  PE for State Roads
Project Related Links (Websites) www.oprd.gov.mk
  • English
  • Македонски










News

First national forum on water sector reorganization will be held in Skopje

May 11, 2017

The Gevgeliga-Tabanovce highway with new road signalization

April 27, 2017
Alternative

National Water Conference, October, 2016: Water reforms presented through three EU funded projects

October 06, 2016

Vacancy Announcements

ОГЛАС БР. 1/2016

May 12, 2017

Contact information

Ministry of Finance
Central Financing and Contracting Department
ul. Dame Gruev Nº 12, 1000 Skopje, R. Macedonia
cfcd.finance.gov.mk

Ministry of Environment and Physical Planning
bul. Goce Delcev Nº 18, 1000 Skopje, R. Macedonia
moepp.gov.mk

Ministry of Transport and Communications
ul. Dame Gruev Nº 6, 1000 Skopje, R. Macedonia
mtc.gov.mk
This project is funded by the European Union