• За ОПРР
  • Проекти
    • ИПА I Оперативна програма за регионален развој 2007-2013
      • Завршување на автопатот на Коридорот 10
        • Upgrading remaining link along the Corridor X to the level of motorway
      • Подобрување и модернизација на транспортната инфраструктура
        • Improving the Rail Infrastructure along the South East Europe Core Regional Network
        • Improving the Road Infrastructure along the South East Europe Core Regional Network
      • Improvement of Environmental Infrastructure
        • Воспоставување на инфраструктура за собирање и пречистување отпадна вода согласно барањата на ЕУ
        • Воспоставување на интегриран и финансиски одржлив систем за управување со отпадот
      • Техничка помош
        • Администрирање на имплементацијата на оперативната програма
        • Подготовка на инвестициски проекти и програми
    • ИПА II Транспорт 2014-2020
      • Priority Action 1 RAIL Transport infrastucture
      • Priority Action 2 Road Transport Infrastucure
      • Priority Action 3
    • IPA II – Животна средина и климатски промени
      • Приближување на законодавството за животна средина и клима во приоритетните области и постепено проближивање кон секторски пристап
      • Инвестиции во управувањето со вода и отпад
      • Поддршка за одржлив развој
  • Новости
  • Документи
  • Вработувања
  • Контакт
  • Тендери

Воспоставување на интегриран и финансиски одржлив систем за управување со отпадот

1. Project Title Preparation of project studies (FSs, EIAs, CBAs), design and tender documentation for establishing of an integrated and financially self-sustainable waste management system in East and Northeast Region
Main Objectives of the Project To contribute, via the development of integrated and financially self-sustainable waste management systems in selected regions of the country, to the sustainable and continuous improvement of the quality of the natural environment of the regions and of the country, in order to reach European Union (EU) standards, especially in relation to public health and environmental protection
Project Outputs/Activities
  •  Task 1: Feasibility studies for the development of an integrated and self sustainable waste management system in East and Northeast regions
    • Data collection
    • Review of the Regional waste management plans
    • Development of the Feasibility Studies
    • Site surveys
    • Elaboration of Cost Benefit Analyses
    • Consultation
  • Task 2: Elaboration of environmental impact assessment
    • Elaboration of Environmental Impact Assessment
    • Support during EIA procedure
    • Revision of FS and CBA studies
  • Task 3: Preparation of IPA financing application
    • Preparation of Financing application
    • Support during the evaluation of the application
  • Task 4: Detailed designs and tender documents for the projects to be financed by IPA
    • Preparation of detailed designs
    • Preparation of Tender Documents
    • Support during tendering
  • Task 5: Information activities
    • Organization of workshops
    • Visibility activities
Start Date  20.01.2016
End Date  20.04.2017
Project type  Service contract
Project Budget  975.000 €
Contractor’s name EPTISA SERVICIOS DE INGENIERÍA S.L.in Consortium with EPEM SA
Beneficiary Ministry of Environment and Physical Planning
Responsible Implementing Department within MoEPP as end beneficiary Waste Management Department
End Beneficiary (other than MoEPP such as municipality and PUC) Inter-Municipal Waste Management Boards of the East and Northeast Regions and the respective Municipalities
Project Related Links (Websites)  N/A
2. Project Title Preparation of technical and tendering documentation for closure of noncompliant landfills/dumpsites for the East and Northeast region
Main Objectives of the Project Preparation of technical and tendering documentation for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions to further contribute towards achieving an integrated and financially self-sustainable waste management system in East and Northeast Regions
Project Outputs/Activities Output no.1: Prepared Assessment Reports of existing situation for municipal non-compliant landfills and dumpsites in East and North-East Regions;
Output no.2: Prepared Technical reports for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions;
Output no.3: Prepared design documentation and cost estimations for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and Northeast region;
Output no.4: Prepared Volume 3, Volume 4 and Volume 5 of the works tender dossier for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions;
Output no. 5: Prepared CBA;
Output no. 6: 11 EIA elaborates prepared.
Start Date 26.01.2015
End Date 31.08.2016
Project type Framework
Project Budget 299.915 EUR
Contractor’s name Particip GmbH and ETI Consulting
Beneficiary Ministry of Environment and Physical Planning
Responsible Implementing Department within MoEPP as end beneficiary Waste Department,
Department for EU
End Beneficiary (other than MoEPP such as municipality and PUC) Inter-Municipal Waste Management Board (IMWMB) of East Region
Inter-Municipal Waste Management Board (IMWMB) of Northeast Region
Project Related Links (Websites)  N/A
3. Project Title Preparation of technical specifications for supply of equipment for waste collection and transferring of waste for East and Northeast region
Main Objectives of the Project Achievement of an integrated and financially self-sustainable waste management system in East and Northeast Regions
Project Outputs/Activities Output no.1: Prepared Assessment Reports based on the review of existing situation of the waste collection and transferring system in the East and Northeast Regions

Output no.2: Prepared Technical Specification Assessment Report for supply of equipment for waste collection and transferring of waste for the East and Northeast regions
Output no.3: Prepared Market Surveys and costs estimations according to the needs for equipment for waste collection and transferring of waste in the East and Northeast regions

Output no.4: Developed Technical Specifications for supply of equipment for waste collection and transferring of waste in the East and North-East Regions

Output no. 5: Feasibility Studies with Cost-Benefit Analysis for Optimization of the Existing Municipal Solid Waste Management Services in East and Northeast Regions

Start Date 26.01.2015
End Date 31.08.2016
Project type Framework
Project Budget 256.561 EUR
Contractor’s name Particip GmBH and ETI Consulting
Beneficiary Ministry of Environment and Physical Planning
Responsible Implementing Department within MoEPP as end beneficiary Waste Department,
Department for EU
End Beneficiary (other than MoEPP such as municipality and PUC) Inter-Municipal Waste Management Board (IMWMB) of East Region

Inter-Municipal Waste Management Board (IMWMB) of Northeast Region

Project Related Links (Websites)  N/A
4. Project Title Preparation of regional waste management plans and strategic environmental assessments for east and north-east regions
Main Objectives of the Project The overall objective of the project is to achieve an integrated and financially self-sustainable waste management system in East and North-East Region of the Beneficiary Country
Project Outputs/Activities The expected results of the Projects are:

Result nº 1:

Prepared Regional Waste Management Plans for the East and North-East Region, approved by the relevant Inter-municipal Public Enterprises for Waste Management in the East and North-East Region.

Result nº 2:

Prepared Strategic Environmental Assessments for the East and North-East Region and approved by the relevant Inter-municipal Public Enterprises for Waste Management in the East and North-East Region

Start Date 10.06.2013
End Date 10.09.2014
Project type Services
Project Budget 1.140.000 €
Contractor’s name ENVIROPLAN S.A. in consortium with C&E Consulting und Engineering GmbH – BT Engineering Ltd
Beneficiary Ministry of Environment and Physical Planning
Responsible Implementing Department within MoEPP as end beneficiary
End Beneficiary (other than MoEPP such as municipality and PUC) Centre for Development of East Planning Region, Centre for Development of North-East Planning Region, 18 municipalities of the 2 regions
Project Related Links (Websites)  http://www.rwmp-mk.com/
5. Project Title Preparation of necessary documents for establishing of an Integrated and Financially Self-sustainable Waste Management System in Pelagonija, Southwest, Vardar and Skopje Regions
Main Objectives of the Project The project main objectives are the preparation of Regional Waste Management Plans (RWMPs) and the relevant Strategic Environmental Assessments (SEAs), the preparation of Feasibility Studies (FSs), Cost‐Benefit Analyses (CBAs), Environmental Impact Assessment (EIAs), Detailed Designs (DD) and assistance with preparation of Tender Dossiers (TDs) for works contracts for construction of selected waste treatment and disposal facilities, closure of noncompliant landfills/dumpsites, as well as preparation of the needed documents  for supply of equipment for waste collection and transferring of waste according to the EU standards for Pelagonija, Southwest, Vardar and Skopje Regions. Moreover stakeholder involvement activities are part of the contract
Project Outputs/Activities The outputs of the project consist of the approved deliverables of the main Objectives for each one of the four Regions, namely RWMPs, SEAs, FSs, CBAs, EIAs, DD and Volumes 3, 4 and 5 of the TDs for the works contracts, needs assessment, market analysis and Technical Specifications for supply of equipment for waste collection and transferring. Stakeholder involvement and public awareness activities are also belonging to the outputs of the contract. The project will be implemented through activities (site visits of existing landfills, dumpsites and rest waste management facilities, completion of questionnaires, qualitative and quantitative waste analysis etc.), reporting, meetings, seminars and workshops and preparation of the necessary documents
Start Date 22.12.2015
End Date 22.12.2017
Project type Services
Project Budget 3.580.000 €
Contractor’s name ENVIROPLAN S.A. in consortium with LOUIS BERGER, BIPRO GmbH, EPEM S.A. and SLR Consulting Limited
Beneficiary Ministry of Environment and Physical Planning

Department for EU

Responsible Implementing Department within MoEPP as end beneficiary Administration for Environment – Waste Department
End Beneficiary (other than MoEPP such as municipality and PUC) Centre for Development of Pelagonija Planning Region, Centre for Development of Southwest Planning Region, Centre for Development of Vardar Planning Region, Centre for Development of Skopje Region, 43 municipalities of the 4 regions
Project Related Links (Websites)  http://4regionalwaste.mk/
  • English
  • Македонски










Новости

First national forum on water sector reorganization will be held in Skopje

May 11, 2017

Автопатот од Гевгелија до Табановце доби нова патна сигнализација

April 27, 2017
Alternative

National Water Conference, October, 2016: Water reforms presented through three EU funded projects

October 06, 2016

Најави за настани

ОГЛАС БР. 1/2016

May 12, 2017

Контакт информации

Министерство за финансии
Централно финансирање и склучување договори
ул. Даме Груев бр. 12, 1000 Скопје, Р. Македонија
cfcd.finance.gov.mk

Министерство за животна средина и просторно планирање
бул. Гоце Делчев бр. 18, 1000 Скопје, Р. Македонија
moepp.gov.mk

Министерство за транспорт и врски
ул. Даме Груев бр. 6, 1000 Скопје, Р. Македонија
mtc.gov.mk
Овој проект е финасиран од Европската Унија