1. Project Title | Preparation of project studies (FSs, EIAs, CBAs), design and tender documentation for establishing of an integrated and financially self-sustainable waste management system in East and Northeast Region |
Main Objectives of the Project | To contribute, via the development of integrated and financially self-sustainable waste management systems in selected regions of the country, to the sustainable and continuous improvement of the quality of the natural environment of the regions and of the country, in order to reach European Union (EU) standards, especially in relation to public health and environmental protection |
Project Outputs/Activities |
|
Start Date | 20.01.2016 |
End Date | 20.04.2017 |
Project type | Service contract |
Project Budget | 975.000 € |
Contractor’s name | EPTISA SERVICIOS DE INGENIERÍA S.L.in Consortium with EPEM SA |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Waste Management Department |
End Beneficiary (other than MoEPP such as municipality and PUC) | Inter-Municipal Waste Management Boards of the East and Northeast Regions and the respective Municipalities |
Project Related Links (Websites) | N/A |
2. Project Title | Preparation of technical and tendering documentation for closure of noncompliant landfills/dumpsites for the East and Northeast region |
Main Objectives of the Project | Preparation of technical and tendering documentation for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions to further contribute towards achieving an integrated and financially self-sustainable waste management system in East and Northeast Regions |
Project Outputs/Activities | Output no.1: Prepared Assessment Reports of existing situation for municipal non-compliant landfills and dumpsites in East and North-East Regions; Output no.2: Prepared Technical reports for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions; Output no.3: Prepared design documentation and cost estimations for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and Northeast region; Output no.4: Prepared Volume 3, Volume 4 and Volume 5 of the works tender dossier for closure, rehabilitation and after care of municipal non-compliant landfills and dumpsites in East and North-East Regions; Output no. 5: Prepared CBA; Output no. 6: 11 EIA elaborates prepared. |
Start Date | 26.01.2015 |
End Date | 31.08.2016 |
Project type | Framework |
Project Budget | 299.915 EUR |
Contractor’s name | Particip GmbH and ETI Consulting |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Waste Department, Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | Inter-Municipal Waste Management Board (IMWMB) of East Region Inter-Municipal Waste Management Board (IMWMB) of Northeast Region |
Project Related Links (Websites) | N/A |
3. Project Title | Preparation of technical specifications for supply of equipment for waste collection and transferring of waste for East and Northeast region |
Main Objectives of the Project | Achievement of an integrated and financially self-sustainable waste management system in East and Northeast Regions |
Project Outputs/Activities | Output no.1: Prepared Assessment Reports based on the review of existing situation of the waste collection and transferring system in the East and Northeast Regions
Output no.2: Prepared Technical Specification Assessment Report for supply of equipment for waste collection and transferring of waste for the East and Northeast regions Output no.4: Developed Technical Specifications for supply of equipment for waste collection and transferring of waste in the East and North-East Regions Output no. 5: Feasibility Studies with Cost-Benefit Analysis for Optimization of the Existing Municipal Solid Waste Management Services in East and Northeast Regions |
Start Date | 26.01.2015 |
End Date | 31.08.2016 |
Project type | Framework |
Project Budget | 256.561 EUR |
Contractor’s name | Particip GmBH and ETI Consulting |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Waste Department, Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | Inter-Municipal Waste Management Board (IMWMB) of East Region
Inter-Municipal Waste Management Board (IMWMB) of Northeast Region |
Project Related Links (Websites) | N/A |
4. Project Title | Preparation of regional waste management plans and strategic environmental assessments for east and north-east regions |
Main Objectives of the Project | The overall objective of the project is to achieve an integrated and financially self-sustainable waste management system in East and North-East Region of the Beneficiary Country |
Project Outputs/Activities | The expected results of the Projects are:
Result nº 1: Prepared Regional Waste Management Plans for the East and North-East Region, approved by the relevant Inter-municipal Public Enterprises for Waste Management in the East and North-East Region. Result nº 2: Prepared Strategic Environmental Assessments for the East and North-East Region and approved by the relevant Inter-municipal Public Enterprises for Waste Management in the East and North-East Region |
Start Date | 10.06.2013 |
End Date | 10.09.2014 |
Project type | Services |
Project Budget | 1.140.000 € |
Contractor’s name | ENVIROPLAN S.A. in consortium with C&E Consulting und Engineering GmbH – BT Engineering Ltd |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | |
End Beneficiary (other than MoEPP such as municipality and PUC) | Centre for Development of East Planning Region, Centre for Development of North-East Planning Region, 18 municipalities of the 2 regions |
Project Related Links (Websites) | http://www.rwmp-mk.com/ |
5. Project Title | Preparation of necessary documents for establishing of an Integrated and Financially Self-sustainable Waste Management System in Pelagonija, Southwest, Vardar and Skopje Regions |
Main Objectives of the Project | The project main objectives are the preparation of Regional Waste Management Plans (RWMPs) and the relevant Strategic Environmental Assessments (SEAs), the preparation of Feasibility Studies (FSs), Cost‐Benefit Analyses (CBAs), Environmental Impact Assessment (EIAs), Detailed Designs (DD) and assistance with preparation of Tender Dossiers (TDs) for works contracts for construction of selected waste treatment and disposal facilities, closure of noncompliant landfills/dumpsites, as well as preparation of the needed documents for supply of equipment for waste collection and transferring of waste according to the EU standards for Pelagonija, Southwest, Vardar and Skopje Regions. Moreover stakeholder involvement activities are part of the contract |
Project Outputs/Activities | The outputs of the project consist of the approved deliverables of the main Objectives for each one of the four Regions, namely RWMPs, SEAs, FSs, CBAs, EIAs, DD and Volumes 3, 4 and 5 of the TDs for the works contracts, needs assessment, market analysis and Technical Specifications for supply of equipment for waste collection and transferring. Stakeholder involvement and public awareness activities are also belonging to the outputs of the contract. The project will be implemented through activities (site visits of existing landfills, dumpsites and rest waste management facilities, completion of questionnaires, qualitative and quantitative waste analysis etc.), reporting, meetings, seminars and workshops and preparation of the necessary documents |
Start Date | 22.12.2015 |
End Date | 22.12.2017 |
Project type | Services |
Project Budget | 3.580.000 € |
Contractor’s name | ENVIROPLAN S.A. in consortium with LOUIS BERGER, BIPRO GmbH, EPEM S.A. and SLR Consulting Limited |
Beneficiary | Ministry of Environment and Physical Planning
Department for EU |
Responsible Implementing Department within MoEPP as end beneficiary | Administration for Environment – Waste Department |
End Beneficiary (other than MoEPP such as municipality and PUC) | Centre for Development of Pelagonija Planning Region, Centre for Development of Southwest Planning Region, Centre for Development of Vardar Planning Region, Centre for Development of Skopje Region, 43 municipalities of the 4 regions |
Project Related Links (Websites) | http://4regionalwaste.mk/ |