1. Project Title | Works Supervision for the Investment Project for Wastewater Collection and Treatment in Prilep |
Main Objectives of the Project | To improve environmental protection through investments in environmental infrastructure and create conditions for environmentally friendly sustainable development with prevention of surface and underground waters pollution |
Project Outputs/Activities | To achieve wastewater quality complying with the EU Directives related to wastewater collection and treatment in Prilep through:
|
Start Date | 02.09.2013 |
End Date | 22.06.2017 |
Project type | Works Supervision/ Technical Assistance Services
Contract No. 10-23557/1 dated 10th July 2013 |
Project Budget | EUR 999.428 |
Contractor’s name | IGIP-Ivanov Consortium |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, Project Implementation Unit Prilep |
End Beneficiary (other than MoEPP such as municipality and PUC) | PUC “Vodovod i Kanalizacija” Prilep |
Project Related Links (Websites) | www.ec.europa.eu/europeaid/work
www.igip.eu |
2. Project Title | Wastewater Collection and Treatment Infrastructure Meeting the EC Requirements in Prilep |
Main Objectives of the Project | To improve environmental protection through investments in environmental infrastructure and create conditions for environmentally friendly sustainable development with prevention of surface and underground waters pollution |
Project Outputs/Activities | To achieve wastewater quality complying with the EU Directives related to wastewater collection and treatment in Prilep through:
|
Start Date | 23.06.2014 |
End Date | 23.06.2016 |
Project type | Works Contract. Construction of Wastewater Treatment Plant in Prilep |
Project Budget | EUR 9.667.773,79 |
Contractor’s name | Ponsstroy |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, Project Implementation Unit Prilep |
End Beneficiary (other than MoEPP such as municipality and PUC) | PUC “Vodovod i Kanalizacija” Prilep |
Project Related Links (Websites) | www.ec.europa.eu/europeaid/work |
3. Project Title | Rehabilitation and extension of sewerage network in Prilep (Phase II) |
Main Objectives of the Project |
|
Project Outputs/Activities | T
Rehabilitation and extension of the sewerage network in Prilep (phase II) in length of 43 km as follows:
|
Start Date | 14.12.2015 |
End Date | 14.03.2018 |
Project type | Construction works |
Project Budget | EUR 7.684.060,61 |
Contractor’s name | Ludwig Pfeiffer Hoch – und Tiefbau GmbH & Co. KG |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, Project Implementation Unit Prilep |
End Beneficiary (other than MoEPP such as municipality and PUC) | PUC “Vodovod i Kanalizacija” Prilep |
Project Related Links (Websites) | www.ec.europa.eu/europeaid/work
www.igip.eu |
4. Project Title | Supervision of the Construction Works for Rehabilitation and Extension of Sewerage Network in Prilep (II Phase) |
Main Objectives of the Project | The overall objective of the project is to improve environmental protection through investments in environmental infrastructure, and create conditions for environment friendly sustainable development, with prevention of surface and underground water pollution |
Project Outputs/Activities | The main result to be achieved is to supervise rehabilitation and extension of the sewerage network in Prilep (II phase) according to Conditions of Contract for Construction, First Edition 1999, FIDIC Red Book and Contract documents, through efficient and effective expertise, resulting in the issuing of the Taking Over Certificate when the Works are substantially completed, and the Performance Certificate at the end of the Defects Liability Period, all of which is required to be achieved within the quality, budget and timing stipulated in the Works Contract |
Start Date | 17.11.2015 |
End Date | 16.04.2018 |
Project type | EuropeAid/134753/IH/SER/MK; IPA Component III |
Project Budget | EUR 499.750 |
Contractor’s name | Ludwig Pfeiffer Hoch – und Tiefbau GmbH & Co. KG |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Ministry of Environment and Physical Planning, Department for EU, Project Implementation Unit Prilep |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Prilep and PUC “Vodovod i Kanalizacija” Prilep |
Project Related Links (Websites) | http://www.eptisa.com/en/news/news/eptisa-supervises-construction-works-for-the-second-phase-of-rehabilitation-and-extension-of-sewerage-network-in-prilep-in-republic-of-macedonia/ |
5. Project Title | Rehabilitation and extension of sewerage network in Municipality of Kumanovo |
Main Objectives of the Project | Rehabilitation of the identified critical section in the existing sanitary sewerage system and extension of the existing system by construction of new sewer in zones that are not covered with wastewater collection service |
Project Outputs/Activities | Execution of main sewerage line, construction of house connection and reinstatement of streets (25,74 km) |
Start Date | 12.05.2016 |
End Date | 04.08.2017 |
Project type | Works Contract, Infrastructural project , first category objects |
Project Budget | EUR 4.323.224,55 |
Contractor’s name | DGT Zikol DOOEL Strumica |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for European Union, PIU Kumanovo |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Kumanovo |
Project Related Links (Websites) | N/A |
6. Project Title | Supervision of the implementation of the works contracts for Rehabilitation and extension of sewerage network in Municipalities of Berovo and Kumanovo |
Main Objectives of the Project | The overall project objective is to improve environmental protection through investments in municipal environmental infrastructure, and create conditions for environment friendly sustainable development, with prevention of surface and underground waters pollution.
This will be achieved in this instance through supervision services, to the Contracting Authority providing sound implementation of the Works Contracts and bringing substantial improvements in the selected municipalities as well as through training of Beneficiary staff so that expertise is transferred and available for future similar undertakings. This rationale translates into the following concrete objectives:
|
Project Outputs/Activities | Outputs: Expected outputs of the projects are as follows:
Results: Expected results of the projects are as follows:
|
Start Date | 08.04.2016 |
End Date | 07.08.2018 |
Project type | Service Contract |
Project Budget | EUR 747.250 |
Contractor’s name | Louis Berger (FR) in consortium with AquaFluent (MK) |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Project Implementation Unit Berovo/ Project Implementation Unit Kumanovo |
End Beneficiary (other than MoEPP such as municipality and PUC) | Public Utility Company Vodovod, Kumanovo / Public Utility Company Usluga Berovo |
Project Related Links (Websites) | N/A |
7. Project Title | Preparation of studies (FS, EIA, CBA), design documentation and tender dossiers for waste water collection and treatment investment projects in the municipalities of Veles and Shtip |
Main Objectives of the Project | The global objective of the project is to improve municipal wastewater collection infrastructure in compliance with the EU directive 91/271/EEC through preparation of relevant documents for the investment project. The project should improve environmental protection and create conditions for environment friendly sustainable development, with prevention of surface and underground waters pollution |
Project Outputs/Activities | Result nº 1: Prepared studies (FS, EIA, CBA) for wastewater collection and treatment investment projects in the Municipalities of Veles and Shtip
Task nº1 – Collection of information, additional measurement and surveys, review and analysis of the water cycle (water supply, collection and treatment of waste water) in the Municipalities of Veles and Shtip Task nº2 – Preparation of Feasibility Studies for wastewater collection and treatment investment projects for each of the Municipalities of Veles and Shtip, including activities for the sewerage network, WWTP and the sludge management programme Task nº3 – Development of a Cost Benefit Analysis for wastewater collection and treatment investment projects for each of the Municipalities of Veles and Shtip Task nº4 – Preparation of Environmental Impact Assessment Studies for wastewater collection and treatment investment projects for each of the Municipalities of Veles and Shtip Task nº5 – Assistance in completing two IPA Applications for wastewater collection and treatment investment projects for each of the Municipalities of Veles and Shtip Result nº 2: Prepared Design documents and Volume 3, 4 and 5 of the Tender Dossiers for works contracts for construction of wastewater collection and treatment infrastructure in the Municipalities of Veles and Shtip Task nº1 – Preparation of design documentation for construction of wastewater collection and treatment infrastructure in the Municipalities of Veles and Shtip Task nº2 – Preparation of Volume 3, 4 and 5 of the Tender Dossiers for works contracts for construction of wastewater collection and treatment infrastructure in the Municipalities of Veles and Shtip |
Start Date | 29.11.2016 |
End Date | 29.05.2018 |
Project type | Service Contract |
Project Budget | EUR 1.499.900 |
Contractor’s name | SAFEGE (FR) in consortium with NIRAS, AECOM, and SAFEGE dooel |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Shtip and PE “Isar” and Municipality of Veles and PCE “Derven” |
Project Related Links (Websites) | N/A |
8. Project Title | Construction of Waste Water Treatment Plant in Kichevo |
Main Objectives of the Project | Design and construction of Waste Water Treatment Plant in Kichevo, LOT Nr.2, Main Collector and Access road |
Project Outputs/Activities | Design and construction of wastewater treatment plant for 32,000 PE and construction of the main collector with 4 km length in the Municipality of Kichevo |
Start Date | 28.04.2016 |
End Date | 21.10.2017 |
Project type | Works, FIDIC 1999, Yellow Book |
Project Budget | EUR 6.924.916,91 |
Contractor’s name | WTE Wassertechnik GMBH in consortium with Trade Company for Production, Projecting and Engineering Vardargradba DOO |
Beneficiary | Ministry of Environment and Physical Planning, Skopje |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, PIU Kichevo |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Kichevo |
Project Related Links (Websites) | www.wte.de; www.vardargradba.com |
9. Project Title | Rehabilitation and Extension of Sewerage Network in Municipality of Berovo |
Main Objectives of the Project | Improvement of the municipal wastewater collection infrastructure in compliance with directive 91/271/EEC and Macedonian Law. The Project envisages measures for upgrading of the existing sewerage system, which would contribute to improved hygienic standards for the population, less problems in maintenance of the sewerage system, protection of the watercourse and proper functioning of the existing WWTP |
Project Outputs/Activities | Construction of sewerage network in total length of approx… 25,5 km in the Municipality of Berovo |
Start Date | 12.05.2016 |
End Date | 05.08.2017 |
Project type | IPA I – Component III-Regional development; Works Contract |
Project Budget | EUR 3.863.186,21 excluding VAT |
Contractor’s name | Chemkostav a.s. in consortium with Konstruktor Renata I dr. Ltd export-import Skopje |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department of the European Union, PIU Berovo |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Berovo and Municipality of Pehcevo |
Project Related Links (Websites) | N/A |
10. Project Title | Reform in the system for water supply, collection and treatment at local level |
ain Objectives of the Project | The overall purpose of the project is to assist the relevant authorities in reforming the existing system, concerning organizational, managerial, financial and operational aspects at local level (City of Skopje and in the Municipalities of Tetovo, Gostivar, Bitola, Kavadarci, Strumitsa, Debar, Radovish, Kichevo, Berovo and Kumanovo) in order to enable an effective and efficient management of the water supply, collection and waste-water treatment |
Project Outputs/Activities | The Project entails four main activities:
|
Start Date | 22.12.2015 |
End Date | 01.11.2017 |
Project type | Service Contract; Global price |
Project Budget | EUR 1.850.000 |
Contractor’s name | EPTISA in consortium with Setec and Geing |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | The 12 PCE’s, The Association of Municipal Public Communal Enterprises – ADKOM, theMinistry of Transport and Communication (MoTC) and the Local Self Government Units |
Project Related Links (Websites) | www.wr.vodamk.mk |
11. Project Title | Reform in Water Sector on Central Level
EuropeAid/136828/IH/SER/MK |
Main Objectives of the Project | With the adoption of the Law on Setting the Prices of Water Services (“Official Gazette of the Republic of Macedonia” no. 7/2016), a solid legal basis for the implementation of the National Water Tariff Study and revised water tariff policy in the Republic of Macedonia is in place.
The Project supports implementation of revised requirements for water services tariff setting as required by the Water Framework Directive. This will in turn support increased investment in infrastructure in order to meet the requirements of the Urban Waste Water Treatment Directive and Drinking Water Directive. The overall objective of the EU funded Project is to establish cost recovery system in water supply and wastewater sector by supporting implementation of the National Water Tariff Study and revised water tariff policy |
Project Outputs/Activities | The purpose of the Project is to implement revised water tariff policy by:
More specifically, the Project will focus on supporting the Energy Regulatory Commission (ERC) of the Republic of Macedonia, responsible for implementation of revised water tariffs methodology in its establishment of working procedures, capacity and capability building measures, decision-making, and guidance to the regulated community. With the new Law on Setting the Prices of Water Services and Amendments of the Energy Law, the Energy Regulatory Commission was entitled with new competences in the field of regulating prices of water services, i.e. setting up tariffs for the bulk water supply and drinking water supply, collection and disposal of urban wastewater, as well as wastewater treatment. The Project will also support Municipalities and Public Utility Companies (PUCs) in application of revised water tariffs methodology and other related requirements, providing advice, guidance and training on implementation issues related to National Water Tariff Study. Support will also be provided to building capabilities in inspection and enforcement of the water tariff system |
Start Date | 22.07.2016 |
End Date | 21.01.2018 (new project end date 10.11.2017 under discussion with CFCD and MoEPP) |
Project type | Service Contract |
Project Budget | EUR 1.801.000 |
Contractor’s name | NIRAS IC sp. z o.o.
in consortium with GISS, The Institute for Water of the Republic of Slovenia and SETEC Engineering |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Ministry of Environment and Physical Planning/Department for European Union |
End Beneficiary (other than MoEPP such as municipality and PUC) | Energy Regulatory Commission
17 PUCs |
Project Related Links (Websites) | http://water-reform.mk/ |
12. Project Title | Supervision of the implementation of the works contracts for Rehabilitation and extension of sewerage network in Municipalities of Radovish, Kichevo and Strumica |
Main Objectives of the Project | The overall project objective is to improve environmental protection through investments in municipal environmental infrastructure, and create conditions for environment friendly sustainable development, with prevention of surface and underground waters pollution.
This will be achieved in this instance through supervision services, to the Contracting Authority providing sound implementation of the Works Contracts and bringing substantial improvements in the selected municipalities as well as through training of Beneficiary staff so that expertise is transferred and available for future similar undertakings. This rationale translates into the following concrete objectives:
|
Project Outputs/Activities | Outputs: Expected outputs of the projects are as follows:
Results: Expected results of the projects are as follows:
|
Start Date | 11.04.2016 |
End Date | 10.12.2018 |
Project type | Service |
Project Budget | EUR 998.850 |
Contractor’s name | Rutex Ltd. (BG) in consortium with Garnets Consulting a.s. (CZ) |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Sector for EU
Project Implementation Unit Radovish Project Implementation Unit Kichevo Project Implementation Unit Strumica |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Radovish
Municipality of Kichevo Municipality of Strumica Public Utility Company Plavaja – Radovish Public Utility Company Komunalec – Kichevo Public Utility Company Komunalec – Strumica |
Project Related Links (Websites) | N/A |
13. Project Title | Construction of Waste Water Treatment Plant in Strumica |
Main Objectives of the Project | Design and construction of Waste Water Treatment Plant in Strumica, LOT Nr.3, Extension of Main Collector |
Project Outputs/Activities | Design and Construction of Wastewater Treatment Plant in Strumica for 53.419 PE and extension of existing main collector for 375 m |
Start Date | 28.04.2016 |
End Date | 21.10.2017 |
Project type | FIDIC 1999, Yellow Book |
Project Budget | EUR 6.910.876,77 incl. provisional sum |
Contractor’s name | WTE Wassertechnik GMBH in consortium with Trade Company for Production, Projecting and Engineering Vardargradba DOO |
Beneficiary | Ministry of Environment and Physical Planning, Skopje |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, PIU Strumica |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Strumica |
Project Related Links (Websites) | www.wte.de; www.vardargradba.com |
14. Project Title | Preparation of studies (FS, CBA), design documentation and Volume 3, 4 and 5 of the tender dossier for wastewater collection investment projects in the Municipality of Kichevo |
Main Objectives of the Project | Preparation of project documentation for Improvement of the Wastewater Collection Infrastructure in the Municipality of Kichevoin compliance with the directive 91/271/EEC |
Project Outputs/Activities | Output nº1: Prepared Preliminary assessment report;
Output nº2: Prepared FS for wastewater collection investment project in the Municipality of Kichevo; Output nº3: Prepared CBA for wastewater collection investment project in the Municipality of Kichevo; Output nº4: Preparation of detail design for rehabilitation and extension of sewerage network in Municipality of Kichevo; Output nº5.1: Preparation of Volume 3, Volume 4 and Volume 5 of the tender dossier for works contract for rehabilitation and extension of the sewerage network in the Municipality of Kichevo according to the FIDIC Red Book conditions of contract 1999 edition. In addition, based on Addendum No.1 12-3107/1 signed on May 9th between the CFCD and the Consultant two additional outputs were requested under this contract: Output nº5.2: Preparation of Volume 3, Volume 4 and Volume 5 of the tender dossier for works contract for extension of WWTP Kichevo (Phase B) according to the FIDIC Yellow Book conditions of contract and based on design documentation prepared by BIPRO member of Particip Consortium. Output nº6: Preparation of IPA application |
Start Date | 31.08.2015 |
End Date | 23.12.2016 |
Project type | Service Contract |
Project Budget | EUR 299.860 after addendum |
Contractor’s name | SAFEGE |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Kichevo and PE Komunalec |
Project Related Links (Websites) | N/A |
15. Project Title | Construction of Waste Water Treatment Plant and rehabilitation and extension of the priority sewerage network in the Municipality of Radovish |
Main Objectives of the Project | Design and construction of Waste Water Treatment Plant in Radovish, LOT Nr.1, rehabilitation and extension of the priority sewerage network, supply and installation of pump station |
Project Outputs/Activities | Design and Construction of Wastewater Treatment Plant for 25.000 PE, rehabilitation and extension of priority sewerage network of 4,7 km and supply and installation of one pumping station in the Municipality of Radovish |
Start Date | 28.04.2016 |
End Date | 21.10.2017 |
Project type | Works, FIDIC 1999, Yellow Book |
Project Budget | EUR 6.027.246,33 incl. provisional sum |
Contractor’s name | WTE Wassertechnik GMBH in consortium with Trade Company for Production, Projecting and Engineering Vardargradba DOO |
Beneficiary | Ministry of Environment and Physical Planning, Skopje |
Responsible Implementing Department within MoEPP as end beneficiary | Department for EU, PIU Radovish |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Radovish |
Project Related Links (Websites) | www.wte.de; www.vardargradba.com |
16. Project Title | Preparation of studies (FS, EIA, CBA), design documentation and tender dossiers for wastewater collection and treatment investment projects in the municipalities of Strumica, Bitola and Tetovo (EuropeAid/133257/D/SER/MK) |
Main Objectives of the Project | The overall objective of the project is through project documentation to facilitate investments in the environmental infrastructure, to improve environmental protection, and to create conditions for environment friendly sustainable development, with prevention of surface and underground waters pollution |
Project Outputs/Activities |
|
Start Date | 22.07.2014 |
End Date | 22.03.2017 |
Project type | Service Contract, Technical Assistance |
Project Budget | EUR 3.203.000 |
Contractor’s name | NIRAS A/S in consortium with Jennings O’Donovan and Partners and J.B. Barry and Partners Limited |
Beneficiary | Ministry of Environment and Physical Planning |
Responsible Implementing Department within MoEPP as end beneficiary | Unit for programming and monitoring of implementation under IPA, Department for EU |
End Beneficiary (other than MoEPP such as municipality and PUC) | Municipality of Strumica, JKP “Komunalec”,
Municipality of Bitola, JKP “Niskogradba”, Municipality of Tetovo and JKP Tetovo |
Project Related Links (Websites) | N/A |
17. Project Title | Preparation of TD for Works – Prilep (II Phase) |
Main Objectives of the Project | |
Project Outputs/Activities | |
Start Date | |
End Date | |
Project type | |
Project Budget | |
Contractor’s name | |
Beneficiary | |
Responsible Implementing Department within MoEPP as end beneficiary | |
End Beneficiary (other than MoEPP such as municipality and PUC) | |
Project Related Links (Websites) |